RUNWAY 17-35 RECONSTRUCTION PROJECT Anderson Regional Airport (AND) Anderson County, SC

Lagan Construction, LLC is the prime contractor for the project which involves reconstruction of the secondary runway pavement at Anderson Regional Airport (AND). The secondary runway, Runway 17-35, is approximately 5,000’ long and 100’ wide with 25’ wide paved shoulders. The paved shoulders will be removed, and the the new runway pavement will be reconstructed using 12-inch deep Full Depth Recla...

More >>

September 2025
June 2025
REHABILITATE RUNWAY 04-22 Lynchburg Regional Airport (LYH) Lynchburg, VA

NEED INFO - 28,000 SY Milling; 29,000 Tons New P-401-&403; 251,000SF Markings; 50,000LF Remove & Replace Airfield Wiring, 70 EA Airfield Lights JV Required

More >>

AIRFIELD PAVEMENT & MARKING MAINTENANCE 2025-2028 Reagan Washington National Airport (DCA) Arlington, VA

NEED INFO -

More >>

November 2024
February 2024
REHABILITATION OF RUNWAY 08-26 Luis Munoz Marin Intl Airport (SJU) San Juan, PR

NEED INFO -

More >>

REHABILITATE RUNWAYS 1-19 & 15-33 AND ASSOCIATED TAXIWAYS Reagan Washington National Airport (DCA) Arlington, VA

NEED INFO -

More >>

December 2022
October 2022
TAXIWAY ALPHA REHABILITATION Pensacola International Airport (PNS) Pensacola, FL

NEED INFO - The proposed scope of work for this project, Taxiway A Rehabilitation, consists of the following: >Reconstruction of Taxiway A1 connector >Rehabilitation (Milling and Overlay) of Taxiway A north of Runway 8-26 >Removal and relocation of Taxiway A2, A3, and A7 connectors >Renaming Apron Connections for Taxiways A2, A3, and A7 to F1, F2 and F3. >Partial rehabilitation (Mill and Overlay) ...

More >>

REPLACE & UPGRADE TAXIWAY WHISKEY 4 Joint Base Andrews (ADW) Camp Springs, MD

NEED INFO - The project is a Design-Bid-Build (DBB) that consists of construction of the Fourth Phase of a four phased project replacing an existing deteriorated taxiway without interrupting the airfield mission. This Phase will be aligned with Phase III “as built” conditions. The work includes the repair/replacement of existing taxiways pavements, shoulders, drainage, signage, lighting systems, d...

More >>

May 2022
October 2021
MCB RUNWAY REPAIRS CLASS A Marine Corps Base Quantico (MCB) Quantico, VA

NEED INFO - This project is a requirement for MCAF Runway Repairs and Shoulder Extension aboard Marine Corps Base (MCB) Quantico in Quantico, Virginia. The project involves making repairs to the asphalt (mill and overlay) and cement pavements on the MCAF runway adding a 10-foot asphalt shoulder extension on both runway sides; grading, drainage, and off-pavement infrastructure improvements to the ...

More >>

REHABILITATE RUNWAY 6-24 Lonesome Pine Airport (LNP) Wise, VA

NEED INFO - This project located at Lonesome Pine Airport includes the rehabilitation of Runway 6-24 (100" x 5350'), relocation of the Runway 6 threshold, replacement of drainage pipe systems, demolition and milling of pavements, rehabilitation of airfield electrical systems, and the installation of a new electrical vault. The project has a total 120 day duration of which 110 day is for the major...

More >>

October 2021
July 2021
EXPANSION OF RUNWAY 15 HOLD BAY Reagan Washington National Aiprort (DCA) Arlington, VA

NEED INFO - Lagan Construction, LLC was the prime contractor to the Metropolitan Washington Airports Authority (MWAA) for the expansion of the hold bay adjacent to runway 15. The project was completed during limited possession times, whilst maintaining live airfield operations which required close coordination with Airfield Operations and Stakeholders​ Convert existing remote aircraft stand f...

More >>

AIRSIDE PAVEMENT REPAIR SC-21-00012 Reagan Washington National Aiprort (DCA) Arlington, VA

NEED INFO - Lagan was the prime contractor for a 3 year maintenance contract which required....

More >>

May 2021
May 2020
REPAIR & REPLACEMENT OF RW 05-23 & OVERRUNS Westover Air Reserve Base (CEF) Chicopee, MA

Lagan Construction, LLC was the prime contractor to the US Army Corps of Engineers, Louisville District for the repair of RW 05-23, RW05-23 overruns and associated Airfield Ground Lighting (AGL) at Westover Air Reserve Base, the largest Air Force Base in the US. The existing runway 05-23 is 11,600 feet long x 300 feet wide and is bisected by runway 15-33, which remains active for 464 of the 480-da...

More >>

TERMINAL A & SOUTH GA PAVEMENT REHAB Reagan Washington National Airport (DCA) Arlington, VA

Lagan US Aviation & Infrastructure, LLC was the prime contractor to the Metropolitan Washington Airports Authority (MWAA) for the rehabilitation of existing asphaltic concrete and new PCC pavement around the Terminal A aircraft stands (9 no.) and associated taxiways, as well as a full rehabilitation of the South GA apron pavement area. The project was completed during limited possession times, ...

More >>

January 2020
September 2019
REHABILITATION OF RUNWAY Farmville Regional Airport (FVX) Farmville, VA

Prime Contractor for rehabilitation of RW03-21 incl 37,000 FDR and 11,000 tons of HMA overlay

More >>

REPAIR BIGGS ARMY AIRFIELD Fort Bliss (BIF) El Paso, TX

Lagan Construction was the airfield paving subcontractor to Sundt Construction, Inc., and its joint venture partner MRM Construction Services (MRM/Sundt), in the reconstruction of the runway at Biggs Army Airfield located at Fort Bliss on El Paso‘s eastside. The $47 million runway reconstruction project consists of approximately 12,000 linear feet of runway replacement and repair, scaling down th...

More >>

June 2019
May 2019
HOLD BAY 4 RECONSTRUCTION Ronald Reagan Washington National Airport (DCA) Arlington, VA

Subcontractor for 4,000 sy milling and placement of 13,200 tons P401 HMA

More >>

RUNWAY 04-22 OVERLAY & TAXIWAY REPAIRS Ronald Reagan Washington National Airport (DCA) Arlington, VA

Lagan Virginia, LLC was the prime contractor to the Metropolitan Washington Airports Authority (MWAA) for the reconstruction and rehabilitation of runway 04-22 and the adjacent taxiways. The project was completed in 10 discreet phases with work performed in a total of 38 work areas during nightly possessions, typically starting at 11:00pm and finishing at 5:30am. The runway and/or taxiway area...

More >>

April 2017
August 2016
WALLOPS FLIGHT FACILITY AIRFIELD REPAIRS Wallops Flight Facility (WAL) Wallops Island, VA

Lagan Construction, LLC was the prime contractor to the National Aeronautics and Space Administration (NASA) for the reconstruction and rehabilitation of runway 04-22 and the parallel taxiway Echo. The runway is 8,850 feet (2,700 m) long and 150 feet (46 m) wide.   The construction scope of work required Lagan to set up and operate both a portable hot mix asphalt plant and a portable central-mi...

More >>

REPAIR DELTA HAMMERHEAD Minot Air Force Base (MIB) Minot, ND

Lagan Construction, LLC was the prime contractor for the US Army Corps of Engineers (USACE) in the reconstruction of Delta Hammerhead at Minot AFB. The work consists of removing and replacing PCC pavement including associated hot-mix asphalt shoulders and AGL works. Approximately 8,250 CY of 18 inch PCC pavement was required to complete the project, conforming with very stringent requirements uni...

More >>

August 2015
June 2015
SOUTHFIELD RUNWAY REPAIRS Naval Air Station Whiting Field (NDZ) Milton, FL

Lagan Construction, LLC was the prime contractor to the Naval Facilities Engineering Command (NAVFAC) and the Dept. of the Navy, on the reconstruction and rehabilitation of two runways, 05-23 and 14-32 at the Southfield. Each runway is 6,000 feet long and 200 feet wide.   Work took place in two distinct phases, each with a six-month duration. During construction Lagan produced and placed over 6...

More >>

REPAIR RUNWAY KEEL AND ASPHALT SECTION Minot Air Force Base (MIB) Minot, ND

Lagan Construction, LLC crews produced, placed and compacted 94,000 tons (86,000 MT) of aggregate and asphalt material over a period of 88 calendar days. In order to comply with strict closure periods, Lagan US purchased, set-up and operated a portable asphalt drum-mix plant to produce the hot-mix asphalt on site, rather than purchase from a third party supplier. Operating our own asphalt plant...

More >>

April 2014
April 2011
RW1-19 REHABILITATION AND SAFETY AREA IMPROVEMENTS ​Ronald Reagan Washington National Airport (DCA) Arlington, VA​

Lagan was the prime contractor for the Metropolitan Washington Airport Authority (MWAA) on the rehabilitation and reconstruction of a 7,000 foot long bituminous asphalt runway (RW 1-19) including removing and replacing between 2” and 11” depth of asphalt shoulders, taxiway, connectors, and existing runway. Works also included the removal and replacement of new centerline and touch-down zone (TDZ)...

More >>

RECONSTRUCTION OF RW 10-28 & SOUTH AIRFIELD​ Luis Muñoz Marin International Airport (SJU) San Juan, PR

Lagan was the prime contractor for the rehabilitation and reconstruction of an 8,000 foot long concrete runway (RW 10-28) including removing and replacing the taxiway and connectors, rubblization of existing runway, placement of graded aggregate base course, base asphalt, drainage layer and Portland cement concrete pavement. ​ Contract works were conducted in planned phases to maintain airfield ...

More >>

May 2005